Funding Amount:
Up to $80,000 (excl. GST) for farm forestry plantings, or up to $40,000 (excl. GST) for integrated environmental plantings. A PSP rebate of up to $5,000 (excl. GST) may also apply
Closing Date:
1 November 2026
Status:
Open
Provider:
Victorian Government – Department of Energy, Environment and Climate Action (DEECA) / Agriculture Victoria
Rounds:
1
Location:
VIC
Who Can Apply:
Freehold landowners in Victoria, or land managers with formal owner approval, holding an ABN/ACN and $10 million public liability insurance. Government bodies and peak bodies are not eligible.
Co-contribution Required?
No stated co-contribution. Failed plantings must be replanted at the landowner’s cost, and PSP costs are paid upfront by the landowner before the rebate.
Purpose and Program Overview
The Victorian Trees on Farms Program (VToF) provides grants to rural landowners who want to integrate trees into agricultural land. It is delivered by the Department of Energy, Environment and Climate Action (DEECA) through Agriculture Victoria. The program combines the former Victorian Carbon Farming Program and the Gippsland Farm Forestry Program into a single statewide program.
The program focuses on trees grown for timber, in line with Victoria’s transition out of native forest harvesting. It also funds environmental plantings that provide shade, shelter and other on-farm benefits. It does not prescribe species or layout, because landowners plant trees for different reasons. The total funding pool for Round 1 is not stated in the sources reviewed.
Projects must support the landowner’s farming enterprise. Funding is available for farm forestry plantings, integrated environmental plantings, or a combination across different blocks.
Key Grant Details
- Grant amount: Up to $4,000 per hectare for farm forestry plantings (maximum $80,000), and $2,000 per hectare for integrated environmental plantings (maximum $40,000). All amounts exclude GST.
- Professional service provider (PSP) rebate: Up to 20% of the maximum project grant value, capped at $5,000 (excl. GST).
- Opening date: Round 1 is currently open. The sources reviewed do not state a specific opening date.
- Closing date: 1 November 2026.
- Eligible applicants: Freehold landowners in Victoria, or land managers with formal approval from the owner.
- Co-contribution: No co-contribution is stated as a requirement.
- Location: Victoria only.
Priority Sectors
The program targets rural landowners and farming enterprises in Victoria. Its stated priorities are timber production through farm forestry and integrated environmental plantings that benefit the surrounding agricultural system. Sectors relevant to the program include:
- Agriculture and farm forestry
- Plantation and timber production
- Environmental and biodiversity plantings
- Carbon farming
Funding Scope
Funding per stream
| Stream | Rate | Maximum |
|---|---|---|
| Farm forestry plantings | Up to $4,000 per hectare | $80,000 |
| Integrated environmental plantings | $2,000 per hectare | $40,000 |
Payment structure
- Funding is paid in instalments on completion of project milestones.
- Farm forestry grants are split into two payments. The first is $2,000 per planted hectare at milestone 1. The second is $2,000 per established hectare at milestone 3, with evidence of management activities or of intent to manage for timber production.
- The higher farm forestry rate reflects the extra costs of pruning and thinning.
Project size
- Farm forestry plantings must be at least 3 hectares.
- Integrated environmental plantings must be at least 5 hectares.
- Projects are intended for up to 20 hectares. Larger projects are considered at the department’s discretion.
Timeline
- The department notifies applicants of the outcome within 12 weeks of submission.
- Planting must not begin before the grant agreement is signed.
- Landowners must commit to maintaining the trees for at least 5 years.
Eligibility Criteria
Applicants must:
- Be the freehold owner of the land in Victoria, or a land manager with formal approval from the owner
- Hold a current Australian Business Number (ABN) or Australian Company Number (ACN), and confirm that the landowner also meets this requirement
- Hold public liability insurance of at least $10 million per occurrence, or confirm that the landowner holds it
- Ensure the landowner meets the department’s due diligence requirements
Project requirements
- Farm forestry plantings must use species with known timber qualities. They must be established in areas receiving at least 500 mm of annual rainfall.
- Integrated environmental plantings must use native species consistent with the local Ecological Vegetation Class. They must be able to sequester at least 5 tCO2-e per hectare per year over 25 years.
- Projects must be implementation-ready (see below).
- Each property title can host only one project, although one project may span several titles.
- Government bodies and peak bodies cannot apply.
Implementation-ready pathways. Applicants must meet one of four pathways:
- Provide evidence of relevant experience, training or previous tree-growing activities of a similar scale.
- Provide a farm master plan, on-farm emissions reduction action plan or similar tree establishment plan.
- Participate in the Trees on Farms Incubator Program.
- Engage a PSP to co-design or help develop the project plan.
Exclusions
- Projects registered for funding from other Victorian Government tree-planting programs are excluded.
- Projects with funding from local government or other non-state sources are assessed for value for money at the department’s discretion.
Eligible Activities and Expenses
Funding must be used to deliver trees in the ground. Eligible activities include:
- planning and project design
- site preparation
- planting
- maintenance
- reporting and accounting for grant expenditure
Supported planting types
- Shelterbelts and timberbelts: Strips at least 10 metres wide that shelter livestock, crops and pasture and produce timber.
- Woodlots: Small timber plantations, generally 3 to 20 hectares.
- Wide-spaced plantings: At least 400 trees per hectare, allowing grazing or cropping alongside timber production.
- Integrated environmental plantings: For example, riparian buffers, or plantings on less productive land to address erosion, salinity or biodiversity.
Not funded
- Areas with existing native vegetation or land cleared of native vegetation in the previous 5 years
- Plantings started before the grant agreement is signed
- Infill planting of failed areas
- Day-to-day business costs, tools, machinery, livestock, feed and crop or pasture seed
- Construction of, or repairs to, non-fencing infrastructure
- Public liability insurance
- Primary producer labour costs, although these can be claimed as an in-kind contribution
Assessment Process
Avant Group describes the program as competitive, with applications assessed by a panel. The department states that applications meeting the minimum program requirements are eligible for funding. Applicants should confirm the assessment approach in the official guidelines.
Key assessment considerations include:
- compliance with the eligibility and planting requirements
- implementation readiness, including a detailed project plan, timeline and budget
- suitability of species selection and site design
- value for money, particularly where other non-state funding is involved
Applicants must also meet the following post-planting conditions:
- A survival rate of at least 70% of the target stocking rate 12 months after establishment.
- No failed area larger than 0.2 hectares. Failed areas must be replanted at the landowner’s cost within 12 months to stay eligible for later payments.
The department provides feedback to unsuccessful applicants on request.
Recent Program Updates
- The Agriculture Victoria program page, last updated on 22 September 2026, states that Round 1 closes on 1 November 2026. Earlier listings gave a closing date of 30 June 2026.
- The department is accepting expressions of interest from prospective PSPs until 1 November 2026, and its PSP register is updated as providers are approved.
- The program is open to projects with registered Australian Carbon Credit Unit (ACCU) scheme interest, provided planting has not started when the VToF application is submitted. Applicants should review the Clean Energy Regulator’s additionality requirements first.
- A VToF project plan template and a project budget template are available on the department’s website.
Application Tips
- Check eligibility first. Confirm land ownership or owner approval, ABN/ACN status, insurance, minimum planting areas, rainfall and native vegetation history.
- Prepare documents early. These include the project plan, project budget, evidence of implementation readiness, and the landowner’s insurance and due diligence information.
- Do not start planting early. Activities carried out before the grant agreement is signed can make a project ineligible.
- Check ACCU timing. Applicants considering the ACCU scheme should seek advice on sequencing before applying.
- Consider a PSP. Applicants without relevant experience may benefit from a professional service provider and may claim the PSP rebate. The landowner pays the PSP invoice, and the rebate is paid after the grant agreement is executed. Unsuccessful applications are not eligible for the rebate.
- Demonstrate outcomes. Show the species selection, site suitability, timber or environmental benefits, and how the project supports the farming enterprise.
Where to Get Help
Consider consulting a grant specialist like Pattens Group for a personalised eligibility assessment and expert assistance in preparing a strong, compliant and competitive application. Contact us today and get connected with Australia’s best grant specialist, boasting over 35 years of experience in the industry and a 100% success rate. For official guidelines, application details, templates, and further information, visit the official website of the Victorian Trees on Farms Program and other associated Australian government websites.
Check Your Eligibility Now
Interested in Victorian Trees on Farms Program (VToF) – Round 1?
Disclaimer: This grants search engine exclusively searches for business grants and does not include community grants or grants for nonprofit organisations.
Australian Government Grants Secured by Pattens for our Clients!
Loading…
Over 3 decades of grant experience with 99.9% success!
If you’re engaged in R&D and exploring government grant opportunities, our accredited and experienced grant managers are here to help. Schedule a call or fill out our Contact Us form today to arrange a meeting. You can also reach us directly at 1800 PATTENS or email grants@pattens.com.

Grants Specialists
Pattens are highly experienced grant experts. We assess all new businesses against more than 1,200 available grants. We then provide a free report on the grants most suited to their business operation and plans. Only after they receive a grant do clients pay us.
No grant, No Fee.
Highly Skilled
With over 28 years of experience and 99.9% success, it is understandable that our team is constantly involved in ongoing training and education in grants. Our internal CPD standard is a minimum of 60 hours per annum compared to accounting bodies that require only 30 CPD hours per annum.
Professional
Pattens is dedicated and committed to ensuring every grant claim we prepare is successful. We pride ourselves on providing the most professional service possible. Our customised management software regulates our workflow and job management to ensure nothing is overlooked.

Pattens Group
Every year, the government gives money through grants to help Australian businesses. A bit here and a bit there, it all adds up to billions. If you’re in business, there’s a good chance you’re eligible, but you have to know which grants and how to apply for them. Let us find a grant for your business.

Our Promise
We’ll get your business a grant, or you pay absolutely nothing! Your success is our priority. From successful grant applications, we enabled a client on the brink of closure to expand to where their business was sold for over $130 million! Is your business our next success?

Government Grants
Pattens are government grants experts. We specialise in claiming grants for Australian businesses. Over the years, we have secured more than $3 billion in Australian government grants for our clients. Our highly qualified and experienced team is familiar with the 1,200+ different grants available for Australian businesses.
Did you know?
- More than 99% of our claims are successful
- No win, no fee
- We’ve won over $3 billion in successful grant claims
- Over 3 decades of experience
- Services provided by accredited staff
- Confidentiality assured
